Release Notes 2.10.17
New features
- The status drop-down list has been moved to a separate component.
- Moving a node is no longer executed immediately, but only after confirming the save button.
- The status colors have been added to the selection list. The current version is displayed in the console when the app is loaded or data is changed from the mobile device.
- Performance has been improved by switching the Blazor app to a buffer concept.
- The drop-down from the filter bar has been moved to a filter drop-down component.
- New JSON data can be loaded directly into a started CheckpointMeeting.
- The OPs in the CheckpointHistory are clickable and their numbers can be retrieved
- Workflow change for the Cancel button: Show and hide form
- In the Manager, it is possible to specify whether the remaining duration for the OPs only applies to Closed or also to Done
- Icon for release-preventing criterion has been changed
- Sending the color information of a status
- Size of the history field has been adjusted
- Initial loading of the Checkpoint Meeting has been accelerated
- Deactivate Checkpoint Meeting OP links in History
- SSO is possible on all Coman-hosted servers
- The mobile device is notified when the status is changed.
- Email templates can be used to set up the sending of emails when tasks are completed (checked off)
- The fields (Problem, Measure) in the LOP mask can be dragged to make them larger or smaller as desired
- In the views, it is possible to deselect all project structure nodes if no atomic node is selected
Bug fixes:
- A loop occurred when the LOPMainTask attribute was active. This error has been fixed.
- The wording in the pop-up dialog for deactivating a project has been adjusted.
- The asset milestones were still visible as structure nodes in the checkpoint meeting; this has been fixed.
- The Save button no longer remains active if the mobile device does not allow the status to be changed.
- The text box now wraps automatically for very long texts.
- View profiles could not be saved in user management. This has been fixed.
- Incorrect link to the LoP table under View/Grant Approval has been corrected.
- The rating status can no longer be changed once approval has been granted.
- The manager always sent the report settings to the server, sometimes overwriting changes. This error has been fixed.
- The user as planner is now also displayed correctly in the project data.
- Traffic light status is now applied.
- Comment fields could not be filled. This error has been fixed.
- Report creation with the “File” selection no longer works only from the second time onwards.
- Problems with user management have been fixed.
- Checklists are now treated in the same way as normal schedule notes in terms of colors.
- Problem with AML roles caused by the “Edit model attributes” function has been fixed.
- In reporting, milestones were printed in the wrong calendar week. This error has been fixed.
- Problem with status change functionality has been fixed.
- Tasks are now updated even after changes have been made.
- The slider is working again.
- A symbol was not clickable everywhere in edit mode; this has been fixed.
- In edit mode, it was no longer possible to select a layout after deleting elements. This has been fixed.
- Problems with multiple locations and label locations have been fixed.
- The problem that users kept disappearing from the views has been fixed.
- AML roles have been “merged.”
- The duplicate “Comment” display in the context menu of the global user management has been corrected.
- Columns in project properties could not be edited. This problem has been fixed.
- Documents/attachments created in the model were not generated in the project. This problem has been fixed.
- Problems with the display of the LoP and OPs not being displayed have been fixed.
- Error in the Gantt chart when moving dates has been fixed.
- Tasks were not created in the correct hierarchy. This problem has been fixed.
- The text box for comments can now be enlarged.