MS-Project import/export based on a COMAN OEM model: background

  • The schedule on the supplier side often does not have the same structure as the required schedule on the part of the OEM
  • COMAN offers the possibility to create a link nevertheless via an extra column in the schedule
  • The import takes place into the schedule released by the OEM, normally the "supplier schedule"
  • For a successful synchronization the OEM must make certain settings in COMAN