MS-Project import/export based on a COMAN OEM model: background
- The schedule on the supplier side often does not have the same structure as the required schedule on the part of the OEM
- COMAN offers the possibility to create a link nevertheless via an extra column in the schedule
- The import takes place into the schedule released by the OEM, normally the "supplier schedule"
- For a successful synchronization the OEM must make certain settings in COMAN